While I expected this to be a short 2–3 month project, based on my Loon tracker, it soon became apparent that the bodies of knowledge involved in placing a Low Earth Orbit (LEO) Non-GeoStationary Orbit (NGSO) constellation into operation are many, and not just in aerospace engineering, or...