I read the Lisbon Metro’s Violet Line proposal paper — I’m worried

<p><strong>The usage of Light Rail for the Lisbon Metro Violet Line is NOT an issue!</strong></p> <p>We have first to understand why it was chosen in the first place. I can&rsquo;t say for sure, it&rsquo;s after all a topic of discussion and contention within my circle of friends, but from what I could figure it most likely has to do with cost. As stated, the initial cost rose from 250M&euro; to 390M&euro;. This is a big jump, but we also have to assume rightfully that the cost of building it like a modern subway would most definitely have risen drastically. The entire circular line project, which contains at most 3km of tunnel and some small viaducts is already set to cost 331M&euro;, and that&rsquo;s just for 4km of infrastructure! Safe to assume that the sheer cost of tunnelling for 14km would be astronomical.</p> <p><a href="https://medium.com/entra%C3%A7o/i-read-the-lisbon-metros-violet-line-proposal-paper-i-m-worried-7e6ab1f3a761"><strong>Visit Now</strong></a></p>
Tags: proposal Paper